top of page
Search
  • Writer's pictureAgnes Sopel

Embarking on a Project: Navigating Through the Planning Phase




Everything is a Prediction: Building Contingencies and Managing Expectations


Embarking on a project is akin to setting sail in unknown waters. The planning phase is pivotal, yet it's essential to remember that all project elements are essentially predictions. This prophetic nature demands the construction of contingencies. For example, if a task is presumed to take five days, a savvy project manager might build in a buffer or additional days to account for unexpected delays. This allows the team to adapt without derailing the project timeline.


Devising a Task List


At the outset, a comprehensive task list is formulated. For instance, in an ISO system implementation, tasks might range from 'Initial Assessment of Current Systems' to 'Training and Development for Employees'. Estimating the time for each task and subtask requires a delicate balancing act, navigated through formulas that consider optimistic, pessimistic, and probable timeframes.


Estimated Time=(Optimistic Time+4×Probable Time+Pessimistic Time)/6Estimated Time=(Optimistic Time+4×Probable Time+Pessimistic Time)/6


Creating a comprehensive table for task estimations for ISO implementation involves identifying key tasks, often referred to as milestones, and subtasks that are pivotal in navigating the ISO implementation journey. Note that the actual times might vary based on organization size, complexity, and specific ISO standards being implemented (such as ISO 9001 for Quality Management or ISO 45001 for Occupational Health and Safety).

Here's a basic and general example to illustrate the structure of task estimations for ISO implementation. Adjustments should be made based on specific organizational needs and contexts:


Example Table: Time Estimation







The tasks and subtasks, especially for steps like Documentation and Implementation, can be much more granular and numerous, based on the specific ISO standard being implemented. This table is simplified and should be expanded upon for actual project planning. All times are estimative and should be adjusted based on the specific organizational context and project scale.


In practical application, having a detailed, thorough, and tailor-fitted task list derived from a thorough understanding of the ISO standard and the organization’s unique processes is critical to successfully navigate through ISO implementation. Additionally, continuously revisiting and revising these estimates as more information becomes available is crucial to maintaining a realistic and achievable project plan.


Resource Estimation: People and Materials


Ensuring the right people and materials are available at the right time is crucial.


Below is a generalized table that emphasizes resource estimation for an ISO implementation plan. This table should be adapted to each organization's unique needs, availability, and capacities. Note that the 'Calculated Time' should be derived from your specific estimations as per the previous table.


Example Table: Resource Estimation



  • *" Cost of People" should be calculated based on the hourly rates or salaries of the individuals involved and the calculated time, plus any potential overtime or additional cost factors. ** "Cost of Materials/Tools" should be determined based on tool subscriptions, material purchases, rental costs, etc.

This table is intended to serve as a foundation for resource estimation in ISO implementation projects. Be sure to further refine each section, breaking down subtasks and requirements as intricately as your project demands. Moreover, collaborating with seasoned ISO consultants or project managers who have prior experience with ISO implementation can be highly beneficial in crafting a more exact and practical project plan and resource estimation. Always ensure that all involved stakeholders provide inputs during the planning phase to establish a comprehensive and inclusive project plan.


Crunching the Costs


Considering all costs, including personnel and materials, is vital.


Total Cost=(People Cost×Time)+Material CostTotal Cost=(People Cost×Time)+Material Cost


Here is an extended table for cost estimation considering an ISO implementation plan, with additional granularity. Note that actual time and costs will significantly depend on your organization's specific circumstances.


Example Table: Cost Estimation






Constructing the Work Breakdown Structure (WBS)


The WBS intertwines all project information, establishing a structured vision that deciphers the scale and scope of the project.


Work Breakdown Structure (WBS) is a foundational tool in project management. It depicts the project scope by breaking down the project into smaller, more manageable parts, thus making project management more straightforward. Let’s construct a simplified Work Breakdown Structure for an ISO Implementation Project:






Crafting a Meticulous Schedule


A detailed schedule becomes the project’s backbone.


Creating a project schedule involves organizing all activities and tasks, assigning a duration, and determining start and finish dates for each, ensuring resource availability, and understanding the dependencies between tasks. Here's an expanded guide and table focused on scheduling for the ISO implementation project.


Considerations for Scheduling in ISO Implementation

  1. Task Dependencies: Understand the relationship between tasks to sequence them appropriately.

  2. Resource Availability: Ensure resources (people, technology, etc.) are available when required.

  3. Risk Management: Incorporate buffers for risks and uncertainties.

  4. Stakeholder Availability: Consider the availability of stakeholders, especially for training and reviews.

  5. Internal and External Factors: Consider factors like company holidays, external audits, or other factors that might impact the schedule.


Example Table: Project Schedule




Notes:

  • Duration: Estimated completion time for each task. Consider using estimations from experts within your organization.

  • Start Date and End Date: Determine when the task should begin and end, considering dependencies and resource availability.

  • Responsible: Individual or team responsible for completing the task.

  • Resource Requirements: Additional resources (human or material) needed for task completion.

  • Predecessor Task: The task(s) that must be completed before the current task can begin.

Remember that maintaining a flexible approach, especially in complex projects, is key. Monitoring and adjusting the schedule as needed, while maintaining clear communication with stakeholders, ensures that the project stays on track and adapts to any changes or challenges encountered.

Make sure to adjust the timeline, roles, and other details according to the specific needs and context of your project and organization.


15 Tips for Effective Scheduling:

1. Develop a Clear Scope:

  • Ensure that the project scope is well-defined and agreed upon by all stakeholders to prevent scope creep and ensure that the schedule is aligned with the project objectives.

2. Work Breakdown Structure (WBS):

  • Develop a detailed WBS that breaks down the project work into smaller, more manageable components. A well-structured WBS helps in precise scheduling and allocation of resources.

3. Use of Project Management Software:

  • Leverage project management software to automate the scheduling process, ensure accuracy, and facilitate easier tracking and adjustments.

4. Consider Resource Availability:

  • Ensure the schedule is developed considering the availability and constraints of resources (both human and material).

5. Incorporate Time Buffers:

  • Implement buffers for activities that have high uncertainty to safeguard the schedule against delays.

6. Sequence Activities Appropriately:

  • Identify and document relationships among project activities. Define dependencies and understand the sequence in which tasks need to be performed.

7. Critical Path Method (CPM):

  • Identify the critical path in your schedule to understand which set of sequential activities has the longest duration. Ensure that critical path activities are closely monitored and controlled to prevent delays.

8. Use of Historical Information:

  • Utilize historical information and organizational process assets to inform the estimation and scheduling process.

9. Ensure Stakeholder Alignment:

  • Ensure all stakeholders have a shared understanding of the schedule and are in agreement to avoid misalignments during project execution.

10. Risk Management:

  • Identify potential risks that might impact the schedule and develop strategies to mitigate, accept, transfer, or avoid them.

11. Communication Management:

  • Develop a communication plan to keep stakeholders informed about schedule progress and any changes.

12. Continuous Monitoring and Control:

  • Continuously monitor the project schedule, identify variances, and take corrective actions when necessary.

13. Use of Project Scheduling Techniques:

  • Implement various scheduling techniques like Gantt charts, PERT charts, and network diagrams to visualize and communicate the schedule effectively.

14. Apply Resource Levelling:

  • Use resource levelling techniques to deal with resource constraints and ensure that over-allocation of resources does not occur.

15. Quality Assurance:

  • Ensure that quality standards are not compromised in adhering to the schedule. Allow time in the schedule for quality assurance activities to ensure that outputs meet the desired standards.

Remember, effective scheduling is pivotal for successful project management, and incorporating best practices and tips from PMBOK can enhance your scheduling efforts and contribute to successful project delivery. Always adapt these tips and practices according to the specific context and requirements of your project.


Weaving the Risk Management Plan


Mitigating risks demands methodical planning and all-encompassing stakeholder involvement.


Developing a Risk Management Plan for ISO implementation involves identifying potential risks and determining strategies to mitigate them. Below is an example of a risk management table based on an ISO implementation project. Note that the actual risks and mitigation strategies might differ depending on the specific context of your project.


Example Table: Risk Management Plan



  • Probability Score: Likelihood of the risk occurring (1 being very unlikely, and 10 being highly likely).

  • Impact Score: The impact of the risk if it does occur (1 being very low impact, and 10 being highly impactful).

  • Response Strategy: How the team plans to address the risk, typically through mitigation, avoidance, transfer, or acceptance.

  • Mitigation Plan: Specific actions that will be taken to address the risk.

The above risk management table is generic and aims to provide a framework for managing risks in an ISO implementation project. Adjust the risks and strategies based on the unique circumstances and characteristics of your project and organization.


Formulating the Communication Management Plan


Ensuring all stakeholders are abreast of project proceedings entails a thorough communication plan.


Constructing a Communication Management Plan for an ISO implementation project involves defining and documenting how communication will occur during the project, ensuring that all stakeholders are well-informed and engaged. Below is a template and a filled-out example for creating a Communication Management Plan for ISO implementation:


Example Table: Communication Management




Conclusion


Project planning, especially for complex ventures like ISO system implementation, demands diligence, strategic foresight, and meticulous detailing. Adhering to globally recognized PMBOK guidelines, entwining intricate aspects like time, cost, and risk management, and ensuring clear communication across all project levels paves the way for a structured, transparent, and potentially successful project execution.

0 views0 comments

Comments


Post: Blog2_Post
bottom of page